Birla A1 Planning Tool
  • Location
  • Area under construction (in sq.ft)
  • Calculate
  • Total Estimated Expenditure (in sq.ft)
    Disclaimer:

    Values have been calculated using the average cost per sq.ft in each location.

    Actual cost will vary depending upon

    1. 1. Desired quality and finishing
    2. 2. Actual cost of material & labor
  • Pre-Construction Stage
    • Design Fees
    • Borewell
  • Construction Stage
    • Marking/Excavation
    • Sand
    • Water
    • Steel / Reinforcement
    • Stone aggregates
    • Concrete Contractor
    • Formwork / Frame work
    • Plumbing / Sanitation
    • Electrical Work
    • Compound Wall / Door Entrance
    • Soil
    • Cement
  • Post-Construction Stage
    • Painting
    • Exterior Flooring
    • Doors & Windows
    • Miscellaneous
Reset
Print Go Back
  • Design Fees 4%
  • Marking/Excavation 3%
  • Sand 4%
  • Water 1%
  • Steel / Reinforcement 4%
  • Bricks 9%
  • Stones 5%
  • Concrete Contractor 9%
  • Formwork / Frame work 3%
  • Borewell 3%
  • Painting 10%
  • Plumbing / Sanitation 7%
  • Electrical Work 5%
  • Exterior Flooring 6%
  • Compound Wall / Door Entrance 2%
  • Doors & Windows 3%
  • Miscellaneous 8%
  • Soil 2%
  • Cement 12%